The project’s brief is the construction of a specialized coal port with a capacity of 20m tonnes per year in the Sukhodol Bay are in Primorsky Krai.
The port is to consist of:
- a sea cargo terminal;
- a rail cargo terminal;
- storage facilities;
- general utilities, security and com-munications systems etc.;
- an approach channel, vessel traffic control system, ground support equipment;
- border control checkpoint, admini-strative buildings.
The main objective of the port is to improve to the port infrastructure for small and medium-sized coal mining enterprises.
Basis for project implementation:
- Social and Economic Development Strategy of the Primorsky Krai through 2025 approved by the Law of Primorsky Krai of 20.10.2008 No. 324-KZ;
- Paragraph 35 of the Minutes of the meeting with Prime Minister V.V. Putin on 24.01.2012 No. VP-P9-1pr.
Coal transshipment volume per annum:
- 1st phase 2017 – 6m tonnes;
- 2nd phase 2019 – 12m tonnes;
- 3d phase 2021 – 20m tonnes (full capacity).
Total complex area – 170.0 hectares.
Total coal storage volume – over 1.2m tonnes.
Operational water area – 18.9 hectares.
Cargo terminals – 2.
Maximum estimated vessel capacity – 120,000 tonnes.
Transshipment rate – 3,500 t/h.
Key technological and technical solutions for environmental protection:
- Layout solutions for the port facilities: distance from the water area – 500 m, distance from nearest settlements – 6 km, protection by natural land relief;
- Use of closed conveyor galleries;
- Coal irrigation at all transshipment and transportation locations;
- Use of aspiration and other additional technological devices for coal-dust control;
- Widespread use of dust barriers;
- Cleaning of the port territory and gondola cars with mobile pneumatic machines;
- Collection of rainwater from the port territory and treatment at modern local wastewater treatment plant.