Morstroytechnology was contracted by Murmansk Sea Trade Port PJSC to conduct research and design work to assess the feasibility of various engineering solutions to reduce the impact of coal dust on the surrounding environment.

The technical feasibility to construct of covered dome shaped or vaulted warehouses was studied, along with dust and wind protection screen options for cargo terminals 1 and 2.

In collaboration with the Academy of Water Transport and Engineering Sciences, Tianjin (China), Morstroytechnology is finalizing the research into the optimal parameters and characteristics for the dust and wind protection screens.